What is GEO-M Package?
Compessor
unit, Storage,Priority Panel, Dispenser, Control Cabinet as all units are
allocate in one enclosure that requires total 6.5 m2.
Compact
a Complete CNG refuelling station requires only to be connected with CNG
pipelines and with the power cables.
Easy to installation and friendly control
system.
Low noise and low vibration design.
Low Cost of total package.

No comments:
Post a Comment